Our mining and power projects

Every project here has our own photos from the site and the figures we can stand behind. Where data is not confirmed yet, we say so. You are welcome to visit our sites or ask for a live video tour.

Row of containerized Weichai gas generator sets at the Rybushanskoe energy center, Saratov region
25.5 MW
gas generation built on three sites
3,654
ASICs in service
40+
gas gensets in operation
since 2022
in industrial mining

Our own sites on gas generation

Energy centers we built and run ourselves in the Saratov region, on the Volga south-east of Moscow. Natural gas goes into our gensets and the power goes straight into ASICs, including our hosting clients' machines.

Gas power projects for clients

Gas generator sets supplied, installed and commissioned for client sites: industrial power and mining.

More site reports are in our projects section (in Russian).

Where we started

A finished project from 2022–2024 that shaped how we run sites today.

What we do on a project

01
Gas and site first

We start with gas: is it available on site, at what pressure and at what stage the connection is. Equipment can be bought in a month; a gas supply cannot.

02
Units sized to the load

Several smaller gensets instead of one large unit, so scheduled maintenance never stops the whole site.

03
Install and commission

Containers or a building, gas train, exhaust, switchboards, parallel operation and load sharing.

04
Run it every day

Maintenance by operating hours, our own monitoring of gensets and ASICs, repairs on site.