Mining profitability calculator
Pick an ASIC from our price list or enter your own hardware, set your electricity or hosting rate and see coins mined, revenue, power cost, net profit, payback and the break-even rate. Bitcoin, Litecoin + Dogecoin, Dash and Zcash.

| Period | BTC | Revenue | Power | Profit |
|---|---|---|---|---|
| Day | 0.000125 | $8.03 | $5.32 | $2.70 |
| Week | 0.000872 | $56.20 | $37.27 | $18.93 |
| Month | 0.00374 | $241 | $160 | $81.11 |
| Year | 0.0455 | $2,930 | $1,943 | $987 |
Antminer S21 XP 270 TH/s × 1 at 5 RUB/kWh, pool fee 1%. Network data: Bitcoin $64,414, as of November 16, 2026. This is an estimate based on network data on the date shown, not a forecast. Revenue changes daily with coin prices and network difficulty. It is not a guarantee of income and not a public offer.
3.65 kW × 720 hours × 5 RUB/kWh incl. VAT, all-inclusive: space, power from our own gas generation, cooling, security, monitoring and on-site repairs. Promotional rate 4.8 RUB/kWh until December 31, 2026 (air-cooled, from 10 devices or 30 kW). Hosting starts from 10 ASICs or 30 kW of load.
How the calculation works
Coins per day = your hashrate × 86,400 s × block reward ÷ (difficulty × work per difficulty unit). Network hashrate is derived from difficulty.
BTC 3.125, LTC 6.25 + DOGE 10,000 (merged), ZEC 0.41666667, DASH 0.41. Transaction fees are not counted.
Rated power × 24 hours × your rate. A month is 30 days (720 hours), a year 365 days.
Future difficulty, halvings and coin price moves. It is today's picture, not a forecast or a guarantee of income.
Next steps
Questions
How does the calculator estimate mining revenue?
Coins per day = your hashrate × 86,400 seconds × block reward to the miner ÷ (network difficulty × work per difficulty unit), minus the pool fee. Network hashrate is derived from difficulty rather than from noisy 24-hour estimates. Revenue is coins × coin price; power cost is power draw × 24 hours × your rate per kWh.
Which block rewards do you use?
The miner's share of the block subsidy: BTC 3.125, LTC 6.25 plus DOGE 10,000 (merged mining with the same hashrate), ZEC 0.41666667 (80% of the subsidy after NU6), DASH 0.41. Transaction fees are not included, so Bitcoin revenue is slightly conservative.
Why is a month 30 days?
A month is 30 days (720 hours), the same as in our hosting invoices, so the power cost here matches the hosting bill. A year is 365 days.
Is the result a forecast?
No. It is an estimate at network data on the date shown. Bitcoin difficulty generally rises over time and halvings cut the block reward, so income a year from now will differ. The result is not a guarantee of income and not a public offer.
What electricity rate should I enter?
Your all-in cost per kWh. FastMine hosting is 5 RUB/kWh incl. VAT, all-inclusive, from 10 ASICs or 30 kW; promotional rate 4.8 RUB/kWh until December 31, 2026 for air-cooled machines. With your own gas generator set on our site the rate is 3.75 RUB/kWh. You can also enter a rate in USD per kWh.
How is the payback period calculated?
Machine price × quantity ÷ monthly profit at today's network data. The default price comes from our price list in RUB incl. VAT; you can replace it with your own. Rising difficulty makes the real payback longer.
Talk to the team
We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.