Vyksa, 1.2 MW: three gas gensets and a mining container, turnkey

An industrial site in Vyksa, Nizhny Novgorod region: three Weichai gas generator sets with 1.2 MW of rated power, a 40 ft mining container and a fleet of Whatsminer M61S+ at 240 TH/s, sized exactly to what the generation delivers. The client did not pay for the equipment in one sum: the gensets, the container and the miners were leased under a single deal.

A crane sets a Weichai gas generator set in place at an industrial site in Vyksa, Nizhny Novgorod region
1.2 MW
installed generation capacity (PRP)
960 kW
continuous power of three units
≈ 220
Whatsminer M61S+ at 240 TH/s, our calculation
One deal
all site equipment leased

What stands on the site

Specifications only. Why each choice was made is explained in the decisions below.

3 × Weichai WPG500NG

400 kW PRP (320 kW continuous) each. The 500 in the model name is kVA, the 400 is kW. Weichai (Baudouin) 6M33 gas engine: six cylinders in line, 19.6 liters, 1,500 rpm. Maintenance every 500 operating hours, 60,000 operating hours to major overhaul.

1 × Mining container, 40 ft

Supply and exhaust ventilation and a power distribution board. Airflow is sized for full load: a miner turns almost all the power it draws into heat, and every kilowatt of load needs its own share of air.

≈ 220 × Whatsminer M61S+, 240 TH/s

About 4.1 kW per machine at 17 J/TH. The whole fleet makes roughly 53 PH/s.

Three decisions behind the site

01
All equipment leased

One leasing deal covers the whole site, miners included. A site of this size means tens of millions of RUB in one payment, and taking that out of working capital is not always sensible. With leasing the payments are spread over the term and are planned to be covered by the site's own output, so the site starts working before it is fully paid for. Leasing is available to Russian legal entities.

02
Three units instead of one large one

One machine can cover the megawatt class, but a gas genset needs maintenance every 500 operating hours, which at 24/7 is about every three weeks. With a single unit the whole site stops for that time. With three, maintenance goes in turns and two-thirds of the power keeps running. This layout costs more to buy and less to run.

03
A container instead of a building

A 40 ft container takes the whole fleet, with no split between two rooms and no construction on site. There is a second benefit: the site can be moved. If the location changes, the gensets and the container go with it, and there is nothing to demolish or restore.

In operation

  • Gensets are serviced in turns by operating hours, so the site never stops completely
  • Generation and the fleet on one site: no grid connection and no transmission charges
  • The whole site moves with its container; there are no permanent structures

The number of machines (about 220) and the hashrate (about 53 PH/s) are our calculation from the generation capacity, not a count on site; the exact number of miners and the launch month are being confirmed. The deal amount, lease terms and cost per kWh are not published.

Questions

How many miners fit in a 40 ft container?

The limit here is not space but generation. Three units give 960 kW of continuous power, minus the container's own ventilation load. Each machine draws about 4.1 kW, which gives a fleet of roughly 220. More would physically fit, but there would be nothing to power them.

What happens to the fleet while one genset is in maintenance?

The two remaining units carry about 640 kW of continuous power, so roughly two-thirds of the fleet keeps working. Scheduled maintenance is planned in advance and takes hours, not days, so it barely shows in monthly output. A full stop happens only for work on the gas inlet.

How is this different from hosting?

It comes down to whose electricity it is. With hosting you pay the generation owner per kWh; here the generation is yours, and the cost of a kWh is the price of gas plus maintenance. In return the site is your responsibility: gas, gensets and the maintenance schedule. This case shows how that difference was financed through leasing without taking money out of the business.

Can you build a site like this for me?

Yes, the configuration is standard: gensets, a container, a fleet and, for Russian legal entities, leasing. You need a site and gas; we calculate and assemble the rest. Send us the gas data and the load you have in mind, and we will size the plant.

Other projects

Related

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.