Turnkey mining data centers on our own gas generation
Data center projects in Russia stall not for lack of money or hardware but for lack of electricity. We build sites that do not depend on whether the grid gives capacity: power comes from own gas generation on site.

Why data center projects stall
Over three years, 38 data center projects with total investment of 128.6 billion RUB were put on hold in Russia. The reason is usually the same: the site cannot get electrical capacity. A 10 MW data center needs a 12–13 MW connection including cooling and UPS, and in the Moscow region, where most data centers are, the existing grid simply does not have it, only after a substation upgrade and years of waiting.
Own generation removes that question: capacity is not requested, it is installed on site. To be fair, gas is not approved overnight either. The difference is months instead of years, and the timeline depends on the technical conditions for gas, not on a queue for grid reconstruction.
If you already have the capacity and the grid delivers it, you do not need us. Our point is that the site does not depend on that answer.
What turnkey means here
Everyone means something different by turnkey. Here is ours, before we talk: what we do, and what we do not. The second list matters more.
Sites we built and run
Not a contractor's portfolio from someone who left after commissioning. Our equipment and our people work on these sites, and we live with the consequences of our own decisions.



How a project runs
The timeline is uneven, and that is not carelessness. Gas approval does not take as long as installation, and only what depends on us can be named in advance.
What is there in terms of gas, land and grid. We calculate capacity, gas consumption and the cost per kWh for your site. This is where it most often turns out that the required capacity is lower than requested.
The longest stage, and it does not depend on us: technical conditions, gas supply design, approval of volumes. It runs in parallel with equipment orders, so the timelines overlap instead of adding up.
Foundations, containers, gensets, gas line, exhaust routes, switchboards and cables. Weichai gensets are delivered 30–60 days from order, inside this stage, not after it.
Start-up, synchronization, loading in steps. Full capacity does not come at once: the equipment is run in, and that is the right order, not a delay.
Maintenance every 500 operating hours, spare parts, site visits, remote monitoring. Your own team can run it: then we train the staff and stay in touch.
What the first calculation reveals
Four questions that usually have no ready answer, and that drive both the budget and the timeline. If you have the answers, the calculation takes a day.
It is set by consumption, not by the number of devices, plus a margin for cooling and the station's auxiliary load. A classic data center adds 2–3 MW to every 10 MW of load; mining needs less, because cooling is simpler.
Rule of thumb: 0.25 m³ per kWh. One megawatt running 24/7 takes about 6,000 m³ a day. That volume must be in the technical conditions, or the station will be limited by the pipe, not by its own capacity.
We build on your site. The land plot, its category and the permits are on the client's side; we help formulate the requirements but do not handle the paperwork.
Redundancy is built in at the calculation stage: several units instead of one large one, so scheduled maintenance does not stop the site. It costs more to buy and less to run.
Questions
Do you build classic data centers or only mining sites?
Our sites are mining data centers: the same power, distribution and containers, but different computing equipment. The engineering carries over to any computing load, including AI and graphics-card computing. We do not do racks, structured cabling or Tier certification: if a site needs Tier III with a confirmed SLA, you need a specialized integrator, and we can cover its power part.
What is the maximum capacity?
Our largest site today is 15 MW, and it is a working site, not a stated capability. We can build larger, but we will not claim experience we do not have.
How much does it cost?
There is no single figure: the cost depends on capacity, gas availability, the need for a building and redundancy requirements. The gensets set the scale: 250 kW from 4,150,000 RUB, 400 kW from 7,990,000 RUB (open frame, incl. VAT). Piping, distribution, containers and installation come on top. We calculate for your site and send a breakdown.
How long does construction take?
At Rybushanskoe it took 75 days from the start of works to design capacity, on a site where gas was already available. If gas has to be approved, the timeline is set by the technical conditions, not by construction, and stretches to months. The honest answer before a site review: count from the gas, not from the equipment.
Can you build the site and hand it over to our team?
Yes, that is our usual format: we train your staff, leave the maintenance schedule and stay on service. Or the other way round: we build and operate it, and the site runs without your own operations team.
Do you build outside Russia?
Our core market is Russia. Contracts are signed with TDM LLC in RUB; projects outside Russia are discussed case by case.