Bitcoin mining hosting in Russia on our own gas generation
Your ASICs run on electricity from our own gas generator sets at energy centers in the Saratov region, south-east of Moscow on the Volga. One rate per kWh, billed by the meter, covers space, cooling, security, monitoring and on-site repairs.

What is included in the rate
One rate per kWh, 5 RUB/kWh incl. VAT, billed by the meter. No installation fee, no charge for rack space, internet or service.
Monthly hosting cost by model
24/7 operation at rated power, 720 hours a month. Per-batch figures and the market comparison are on the pricing page.
| Model | Hashrate | Power | Per month at 5 RUB/kWh | ≈ USD | At 4.8 RUB/kWh |
|---|---|---|---|---|---|
| Antminer S21 XP | 270 TH/s | 3,645 W | 13,122 RUB | $160 | 12,597 RUB |
| Antminer S21 Pro+ | 234 TH/s | 3,510 W | 12,636 RUB | $154 | 12,131 RUB |
| Antminer S21++ | 235 TH/s | 3,878 W | 13,961 RUB | $170 | 13,402 RUB |
| Whatsminer M60S++ | 228 TH/s | 3,534 W | 12,722 RUB | $155 | 12,214 RUB |
| Whatsminer M60S+ | 210 TH/s | 3,570 W | 12,852 RUB | $156 | 12,338 RUB |
| Whatsminer M60 | 178 TH/s | 3,542 W | 12,751 RUB | $155 | 12,241 RUB |
| Antminer L9 | 16 GH/s | 3,360 W | 12,096 RUB | $147 | 11,612 RUB |
| Antminer L7 | 9,050 MH/s | 3,258 W | 11,729 RUB | $143 | 11,260 RUB |
Rated power × 720 hours × rate, incl. VAT. Billed by the meter, so actual bills are at or below these figures. Promotional rate until December 31, 2026. Linked models open their profitability estimate: revenue, break-even rate and payback. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.
How we compare
Our rate is mid-market, not the lowest on paper. The difference is what it includes: own gas generation, no extra fees, billing by the meter, repairs on site and a contract incl. VAT in a region without a ban.
| Market | All-in rate per kWh | What to know | Source |
|---|---|---|---|
| FastMine, Russia (own gas generation) | 5 RUB/kWh incl. VAT≈ $0.061/kWh | All-inclusive, billed by the meter, from 10 ASICs or 30 kW; contract with TDM LLC in RUB. | Our rate |
| Russia, other hosting sites | $0.05–0.07 | Older public data; most sites resell grid power, and the grid tariff is indexed every year. | Tom's Hardware, HASHR8 / Compass report |
| Kazakhstan | $0.049–0.08 | The low end requires a multi-year prepayment; much of the power is coal-based. | OneMiners, BeInCrypto |
| Ethiopia | $0.036–0.062 | Hydropower; the low end is a large operator's power purchase agreement, not retail hosting. | OneMiners, Digital Money Box |
| United States, retail hosting | $0.065–0.095 | Often billed by nameplate power, with setup or service fees on top. | Simple Mining, MillionMiner |
Advertised rates as published by the sources, compiled on November 3, 2026; check current quotes and what each rate includes. Other sites in Russia are not named on purpose. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB. Full table: hosting cost per month.
Comparing sites? Use the nine questions to ask before you sign, on us and on anyone else.
Our sites: 25.5 MW of own gas generation
Three sites in the Saratov region; 3,654 ASICs in service at the flagship Rybushanskoe site alone. Each site has its own gas generation, engineering team, monitoring and security.




How hosting starts
Send the models, quantity and the city they ship from. We check space at the site and agree on the intake date.
Fixed rate, documents incl. VAT, the operator is listed in the FNS register. Signed before the equipment leaves.
By transport company within Russia, usually 2–5 days on the road. Delivery is paid by the owner; we advise on packing and cargo insurance.
Boxes are opened on video, serial numbers are checked against your list, any discrepancies go into a signed report.
Mounting, setup on your pool and workers, access to monitoring: usually 1–2 days after arrival. Mining rewards go straight to your wallet.
Once a month, by meter readings: invoice and closing documents incl. VAT.
Legal and on paper
Hosting is legal in Russia when three conditions are met, and all three apply to our sites. Details, restricted regions and decrees: is mining legal in Russia.
The Saratov region is not on any list of regions where mining is restricted.
Electricity comes from our own gas generation on site, not from a grid connection in somebody else's name.
We are in the Federal Tax Service (FNS) register of mining infrastructure operators; details come with the contract.
TDM LLC signs the contract under Russian law, in RUB, with monthly closing documents.
Hydro-cooled ASICs are hosted in Antspace hydro containers; terms on request. See hydro containers.
Hosting in detail
What your ASICs earn, and buying them
Profit depends on the machine's efficiency, the Bitcoin price and network difficulty. Estimates at our rate, not a guarantee of income.
Questions
How much does it cost to host one ASIC?
Billed by the meter, not by nameplate: kW consumed × hours × 5 RUB/kWh incl. VAT. Running 24/7 (720 hours a month), an Antminer S21 XP (3.645 kW) comes to about 13,122 RUB a month, or about 12,597 RUB at the promotional 4.8 RUB/kWh until December 31, 2026. Space, cooling, security, monitoring and engineers are included.
Is there a promotional rate?
Yes: 4.8 RUB/kWh incl. VAT until December 31, 2026; from January 1, 2027: 5 RUB/kWh. From 10 devices or 30 kW, air-cooled machines only.
Are there setup fees or hidden charges?
No installation fee and no charge for rack space, internet or service: only the kWh by the meter. Paid separately: delivery to the site, if we arrange it, and spare parts for repairs. The engineers' work is included.
What is the minimum volume?
From 10 ASICs or 30 kW of total load. The rate is the same for ten machines and for a thousand.
Do you accept hydro-cooled miners?
Yes. Hydro-cooled ASICs are hosted in Antspace hydro containers; terms on request. The standard all-inclusive rate applies to air-cooled machines such as Antminer S21 XP, S21 Pro+, S21++, L9 and Whatsminer M60 series.
Where are the sites?
In the Saratov region of Russia: Rybushanskoe (15 MW, 3,654 ASICs in service) and Surovskoe (8 MW), 25.5 MW of own gas generation on three sites. Power comes from our Weichai gas generator sets running on natural gas, not from the grid.
Is mining hosting legal in Russia?
Yes, provided the region is not restricted, the power supply is legal and the operator is in the FNS register of mining infrastructure operators. All three apply to our sites.
Which regions are restricted?
Moscow, the Moscow region and eight districts of the Kursk region from August 15, 2026 to December 31, 2032; the North Caucasus republics and other territories listed in Decree No. 1869 until March 15, 2031; and year-round bans in the south of the Irkutsk region and parts of Buryatia and Zabaykalsky Krai. The full table with decree numbers is on our page about mining law.
What if a miner breaks?
Diagnostics and repair are done by engineers on site; the machine does not leave. We handle warranty cases with the supplier and send a report on every incident. Spare parts are paid by the owner.
How do I send miners to you?
By a transport company within Russia, usually 2–5 days on the road. We open the boxes on video, check serial numbers against your list and record any discrepancies; mounting and setup on your pool take 1–2 days after arrival.
Can I visit the site?
Yes, by appointment during working hours. If the trip is too long, we send a video tour of the infrastructure.
Can clients outside Russia host with you?
Contracts are signed with TDM LLC (INN 9726051386) under Russian law, in RUB. Clients outside Russia: case by case. Please check the rules of your jurisdiction, including sanctions, with your counsel.
Is mining profitable at 5 RUB/kWh?
It depends on the efficiency of the machine (J/TH), the Bitcoin price and network difficulty, which change every day. Current-generation machines at 13.5–16.5 J/TH have a wider margin than older ones. Any figure is an estimate, not a guarantee of income and not a public offer.
Can I buy ASICs through you?
Yes. We supply Bitmain and MicroBT machines cleared through Russian customs, with VAT, install them and connect them to your pool.
Related
Talk to the team
We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.