Turnkey Bitcoin mining farm: a 400 kW gas genset and 85 ASICs
The package we build most often: one Weichai 400 kW gas generator set (320 kW continuous), one container and 85 air-cooled Antminer S21 Pro+. Gas becomes 19.9 PH/s of hashrate, and a kWh costs about 3.75 RUB/kWh to produce. Below is the economics factor by factor; the machine and the number of gensets you choose yourself.

What the package consists of
A genset, a container and the machines; we supply or connect each of them. The weak point of any such project is gas: without it nothing else makes sense, so that is where we start.



What the package earns
Revenue at network data on November 16, 2026, pool fee 1%, a month of 30 days. Machine prices from our price list of October 22, 2026, genset price incl. VAT. Choose the machine and the number of gensets.
1 × 400 kW genset · 85 × Antminer S21 Pro+ · 19.9 PH/s · 298 kW load. The package standard.
Power takes 55% of revenue on your own genset; with hosting at 5 RUB/kWh it would be 74%, from the grid at 5.7 RUB/kWh 84%.
Power is counted for 720 hours a month in every option, like revenue. Difficulty rises, so income in six months will differ. The container, switchboard, cables and installation are not in the investment: the amount depends on the site. This is an estimate based on network data on the date shown, not a forecast. Revenue changes daily with coin prices and network difficulty. It is not a guarantee of income and not a public offer.
The same 85 machines: own genset, hosting or grid
Revenue is the same in all three cases. The difference is the power bill and what you buy at the start.
| Own genset (yours or at our site) | Hosting at 5 RUB/kWh | Grid at 5.7 RUB/kWh, your site | |
|---|---|---|---|
| Rate per kWh | 3.75 RUB/kWh | 5 RUB/kWh | 5.7 RUB/kWh |
| Power a month | 805,545 RUB | 1,074,060 RUB | 1,224,428 RUB |
| Net a month | 651,981 RUB | 383,466 RUB | 233,098 RUB |
| Investment | 29,006,960 RUB* | 20,516,960 RUB | 20,516,960 RUB + grid connection |
| Payback | 44 months | 54 months | 88 months |
| In three years | the genset is yours, power at 3.75 RUB/kWh | the machines are yours, rate 5 RUB/kWh | the machines are yours, the tariff is indexed every year |
* Gensets and machines; the container and installation depend on the site. Hosting: the genset and container are ours, you pay only for kWh. Grid: assuming you have the capacity. This is an estimate based on network data on the date shown, not a forecast. Revenue changes daily with coin prices and network difficulty. It is not a guarantee of income and not a public offer.
One, two, three: the farm grows one genset at a time
Each genset gets its own container and its own 85 machines. Gensets run in parallel, so maintenance of one does not stop the others.
| Gensets | Continuous power | Machines | Hashrate | Net a month | Investment | Payback |
|---|---|---|---|---|---|---|
| 1 × 400 kW | 320 kW | 85 | 19.9 PH/s | 651,981 RUB | 29,006,960 RUB | 44 months |
| 2 × 400 kW | 640 kW | 170 | 39.8 PH/s | 1,303,962 RUB | 58,013,920 RUB | 44 months |
| 3 × 400 kW | 960 kW | 255 | 59.7 PH/s | 1,955,943 RUB | 87,020,880 RUB | 44 months |
Antminer S21 Pro+ at 3.75 RUB/kWh; investment is gensets and machines, without the container and installation. This is an estimate based on network data on the date shown, not a forecast. Revenue changes daily with coin prices and network difficulty. It is not a guarantee of income and not a public offer.
From gas to the first hash
The genset needs gas at a pressure from 7.5 kPa and up to 85 m³/h, a level pad of 12 × 8 m and crane access. No gas on your site? We calculate the package at our site, where gas is available.
A Weichai WPG500NG in a sound-attenuated canopy: 320 kW of continuous power, of which 300 kW go to the miners and the rest to container ventilation and the genset's auxiliary load.
A 20 or 40 ft container with supply and exhaust ventilation, racks for 80–90 air-cooled machines and a switchboard with breakers and metering. One container per genset.
85 air-cooled Antminer S21 Pro+ per genset. Intake, setup on your pool and start-up in batches, so the genset takes the load gradually.
Commissioning takes 5–7 days. Then maintenance follows the engine schedule: oil every 500–750 operating hours, spark plugs and valves on schedule, 24/7 monitoring of the genset and the machines.
What we do, and what the investment figure leaves out
Three ways to run the same machines
Related
Questions
Why 85 machines and not 100, if the genset is 400 kW?
400 kW is prime power; continuous power for 24/7 operation is 320 kW. Of that, 300 kW goes to the miners and the rest to container ventilation and the genset's auxiliary load: 300,000 W ÷ 3,510 W per Antminer S21 Pro+ = 85 machines. Loading a genset to the limit is a mistake: machines draw more in summer, and the genset must hold the load without dips.
What is included in 3.75 RUB/kWh?
Gas at the price for businesses, oil changes on schedule, consumables and scheduled maintenance. It is the cost of power on your own genset, not a hosting rate. Cheaper gas makes it lower and more expensive gas higher; we calculate at your gas price.
What is not included in the investment figure?
The container with ventilation and racks, the switchboard, cables, installation and commissioning. There is no single figure for them: a container can be 20 or 40 ft, new or used, with or without wiring. We name the amount after a site review, together with the installation timeline.
What if the Bitcoin price falls?
Power on your own genset costs 3.75 RUB/kWh, and that is the main protection: at a Bitcoin price where hosting at 5 RUB/kWh only covers its power, a package on its own genset still has a margin. There is no guarantee of income: the page shows arithmetic at the stated inputs. It is an estimate, not a public offer.
Can the package stand at your site rather than mine?
Yes, and that is the more common choice: the genset is yours and stands at our site; gas, maintenance and the container are ours, and power costs 3.75 RUB/kWh. Or skip the genset and host the machines at 5 RUB/kWh. The comparison table on this page shows all three options.
How do I scale?
One genset at a time: each adds 85 machines and one container. Three gensets give 960 kW of continuous power and about 255 machines. Gensets run in parallel through a controller, so maintenance of one does not stop the others.
Can clients outside Russia buy the package?
Contracts are signed with TDM LLC (INN 9726051386) under Russian law, in RUB. Clients outside Russia: case by case. Please check the rules of your jurisdiction, including sanctions, with your counsel.
Talk to the team
We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.