Tereshkovo gas turbine plant: where the team started

FastMine's industrial story began in 2022 at the Tereshkovo gas turbine power plant in Moscow. We started with 4 MW and a rate from 4 RUB/kWh, one of the best on the market at the time, and grew to 10 MW by early 2024. The site combined a good rate inside Moscow, an hour's drive, brand service centers nearby and simple logistics. Here we built what we later took to every next site: on-site technicians and our own monitoring. The project ended when we launched our own generation.

Aerial view of the Tereshkovo gas turbine power plant in Moscow, where FastMine ran a mining site
4 → 10 MW
growth on the site
from 4 RUB
per kWh in 2022
2022–2024
project period
184 MW
capacity of the power plant

The fleet: flagships of their time

Both models at 104 TH/s were the top production machines of the two main manufacturers in 2022. There was no own generation on this site: power came from the operating power plant.

104 TH/s Whatsminer M30S++

MicroBT's flagship of the time, air-cooled.

104 TH/s Antminer S19j Pro

Bitmain's flagship of the time and the most common machine on the market in 2022.

Two years in five steps

01
Starting at 4 MW

The team's first industrial volume, on the infrastructure of an operating power plant: Tereshkovo is a 184 MW gas turbine plant in the Solntsevo district of Moscow, commissioned in 2012 and selling to the wholesale electricity market.

02
From 4 RUB/kWh

In 2022 this was one of the best hosting offers on the market. Betting on direct access to generation rather than reselling grid capacity defined our approach at every later site.

03
On-site technicians

Here we set up engineers working on site: diagnostics and repair on the spot, without sending machines away. Keeping ASICs on site became the FastMine standard.

04
Own monitoring

Here we also built our fleet monitoring: hashrate, temperature and downtime for every machine. It grew into the two monitoring systems that run at our Saratov region sites today.

05
Growing to 10 MW

By early 2024 the site grew from 4 to 10 MW, two and a half times in two years. Then the work at Tereshkovo ended: the team moved to its own generation, and the next site was built on our own infrastructure.

Why this site was special

Industrial sites usually make you choose: cheap power a thousand kilometers away, or convenience nearby at a price that eats the margin. Tereshkovo offered both, a combination rarely found on the market.

  • A rate from 4 RUB/kWh, one of the best in 2022, inside Moscow rather than in a remote region
  • An hour to the site: delivering or collecting a batch of equipment without a business trip
  • Brand service centers nearby: warranty repairs came back in days, not weeks
  • Simple logistics: imported equipment passed through Moscow, so the path from the customs warehouse to the rack was short
  • A secure facility with 24/7 guards and controlled access, the physical security of an operating power plant
  • Engineers on site: diagnostics and repair on the spot, without shipping equipment away
  • Per-machine monitoring: hashrate, temperature, downtime

Photos from the site

Mining site on the grounds of the Tereshkovo power plant: ASIC container modules, a mobile crane and the plant building
Installing ASIC container modules in two tiers by mobile crane at Tereshkovo
Mining site during installation: container modules, crane and the gas turbine plant building
Racks of ASIC miners inside a container module, switchboards and cable routes
A FastMine engineer servicing ASIC racks on site
Dense ASIC layout in container racks with power and network lines to every machine

Not yet published: the number of machines hosted and the exact start and end months of the project.

Questions

Why did the team leave Moscow for the regions?

Because of power economics. In Moscow we worked on the infrastructure of an operating power plant, and the rate was tied to grid terms. Our own gas generation in the region gives a cheaper kWh: today 3.75 RUB/kWh with your own genset at our Saratov region sites, versus 4 RUB and more in the Moscow project. The decision proved right for a second reason: mining in Moscow and the Moscow region is banned from August 15, 2026 until the end of 2032.

Does FastMine still operate at this site?

No. Work at Tereshkovo ended in early 2024, when our own generation started. This is a historical case from 2022–2024. Our hosting sites are now in the Saratov region, where mining is allowed and where we generate the power ourselves.

What from that experience is used today?

Two things that make up the operational side of our service: technicians working on site and our own equipment monitoring. Both grew out of this project and now run at all our energy centers.

Other projects

Related

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.