Rybushanskoe energy center, 15 MW

Our flagship mining data center in the Saratov region, on the Volga south-east of Moscow. 43 Weichai gas generator sets power 3,654 ASICs directly, with no grid company in between and no dependence on retail power tariffs. It took 75 days from the start of works to design capacity.

FastMine 15 MW energy center at Rybushanskoe: gas generator modules and gas piping
15 MW
installed capacity
3,654
ASICs in service
43
Weichai gas gensets
75 days
from start to design capacity
Host your ASICs on our sites: 5 RUB/kWh incl. VAT≈ $0.061/kWh all-inclusive, from 10 air-cooled ASICs or 30 kW.Hosting terms →

Six months between two photos

Two photos of the same site. December 6, 2025: a gas pipeline on supports crosses bare, frozen ground, with a site cabin and a crane further down the line. There is no energy center yet. June 10, 2026: a row of numbered generator modules with silencers on their roofs, and the same yellow pipe coming in from the right.

The gensets themselves went in quickly, but the gas line came first and takes no less time: pipeline, metering unit, pressure reduction and approvals with the gas utility. Equipment can be bought in a month; a gas supply cannot. That is why every conversation about timelines starts with one question: is there gas at your site, and at what stage is the connection?

Gas pipeline under construction at the future Rybushanskoe energy center, December 2025
December 6, 2025: the gas pipeline on supports, flanges and valves marked at every joint.
Row of gas generator modules with roof silencers at the Rybushanskoe energy center, June 2026
June 10, 2026: numbered generator modules with exhaust silencers; the same yellow pipe on the right.

43 Weichai gas generator sets

The units run in parallel with synchronization and load sharing, so one unit going into maintenance does not stop the site.

36 × Weichai, 400 kW class

The main generation fleet, 320 kW each.

2 × Weichai 1375

Large units that carry the site's base load.

5 × Weichai WP13

Smaller units that cover peaks and provide reserve.

How it was built

01
Bare land

A year earlier there was nothing here but open land. The site was chosen for access to gas, not for proximity to power lines, and that choice defines the economics of the whole project.

02
Generation

43 Weichai gas gensets: 36 units of the 400 kW class, 2 × 1375 and 5 × WP13. Parallel operation, synchronization automation and load sharing.

03
ASIC modules

Containerized modules for ASICs with industrial ventilation, power distribution and monitoring.

04
75 days to design capacity

From the start of works to design capacity took 75 days. For comparison, a 640 kW mining complex is usually commissioned in 50–60 days; this site is 23 times larger.

How the site is run

  • Our own ASIC monitoring system: hashrate, temperature and downtime for every machine
  • Our own genset monitoring system: load, operating hours and parameters of every unit
  • Repair shop on site: faults are fixed here, equipment is not shipped away
  • 24/7 operations team: permanent staff, not a visiting crew
  • Scheduled genset maintenance by operating hours, with our own stock of consumables
  • Lubricants selected for continuous operation on natural gas
  • Regular spare parts supply; power supplies and hashboards replaced on site

Photos from the site

Row of containerized gas gensets at Rybushanskoe, cabinets labeled for maintenance
Gas pipeline along the row of gensets and power cable lines at the energy center
Pressure gauge on the gas line in front of the gensets
Commissioning a gas genset: a FastMine engineer sets up the unit from a laptop
Setting up the Woodward controller of a gas genset on site
Cooling system control cabinet with fan status indicators
FastMine operations engineers entering an equipment module
Operations team at work: generation containers and an ASIC module
Racks of ASIC miners inside a hosting module at Rybushanskoe
Aisle between ASIC racks inside a hosting container: power and network cabling

Not yet published: gas price, site area, number of hosting modules and operations headcount. We will add them once confirmed.

Questions

Can I host my equipment at this site?

Yes. Rybushanskoe is our main hosting site: 3,654 ASICs are in service here, some of them owned by clients. Hosting is 5 RUB/kWh incl. VAT, all-inclusive, from 10 air-cooled ASICs or 30 kW; with your own gas genset on our site the rate is 3.75 RUB/kWh.

Why the Saratov region and not Moscow?

Because we follow gas, not power lines. Many hosting providers resell grid capacity and cluster around Moscow; we generate the electricity ourselves on site. Mining in Moscow and the Moscow region is also banned from August 15, 2026 until the end of 2032, while the Saratov region is not on the list of restricted regions.

Can I visit the site?

Yes, by appointment with a manager. We will show the generation, the hosting modules, the server room and client equipment at work. We think this is the right check: a provider that does not let you on site is probably not showing its own site.

What happens if a genset stops?

A large fleet means redundancy: one unit going into maintenance does not stop the site. The genset monitoring system flags deviations, and the repair team on site fixes them, so downtime is counted in hours, not weeks.

How do I see what is happening with my equipment?

We run two in-house monitoring systems: one for ASICs (hashrate, temperature and downtime per machine) and one for gas gensets (load, operating hours, parameters). The status of your equipment comes to a Telegram bot, without calling a manager.

Other projects

Related

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.