Invest in gas power for Bitcoin mining

Buy a Weichai gas power station that runs at our energy center in the Saratov region and receive a lease for every kWh it generates. The station is a physical asset with a serial number on your balance sheet, not a share in a fund.

Aerial view of a FastMine gas power site in the Saratov region
8,490,000 RUB
400 kW station in canopy, incl. VAT ≈ $103,300
1 RUB
lease per kWh generated
≈ 28%
simple yield a year: estimate, not a guarantee
60,000 h
operating hours to major overhaul

How it works

01
You buy the station

Weichai 400 kW (320 kW continuous) in a sound-attenuated canopy, 8,490,000 RUB incl. VAT. Registered to you with its passport and serial number.

02
It joins our site

Saratov region, our own gas-fired generation. Gas supply, piping and connection are already in place: the station joins a running energy center.

03
We operate and load it

Scheduled maintenance per the factory schedule, oil analysis, repairs and 24/7 monitoring. The power is sold to our hosting clients.

04
You receive the lease

1 RUB for each kWh generated, paid monthly or quarterly with a generation report. The station stays yours.

The estimate, line by line

300 kW average load × 8,000 h a year (out of 8,760; the rest is scheduled maintenance) × 1 RUB per kWh
= 2,400,000 RUB a year, about 200,000 RUB a month (≈ $29,200 a year)
On 8,490,000 RUB: about 28% simple yield a year, simple payback about 42 months, before taxes and before a top-end engine overhaul expected around year three.

An estimate, not a guarantee of income and not a public offer. Minimum contract term 24 months. The rate, any minimum payment, term and responsibilities are set in the contract.

What is yours and what is ours

You get
  • The station: a physical asset on your balance sheet with its passport and serial number, not a share in a project
  • A lease payment for every kWh generated
  • The right to sell the station or take it back at the end of the contract
  • A generation report and a contract with VAT
We provide
  • The site, gas supply, connection and piping
  • Scheduled maintenance per the factory schedule, oil with lab analysis, all repairs
  • Loading the capacity with our hosting clients
  • 24/7 monitoring, security and insurance on site

Risks, stated plainly

Three things can reduce what you receive. Each of them is handled in the contract before signing, not after.

Fewer than 8,000 operating hours

Scheduled stops are built into 8,000 of the 8,760 hours in a year. Unplanned downtime caused by us does not count against you: the contract term is extended. If gas or the grid stops for reasons beyond our control, there is no generation and no lease for that time: the lease is paid on actual kWh.

Load below 300 kW

We keep the capacity loaded with hosting clients, and demand for hosting is currently high. If the load falls, generation falls too. Any minimum payment is set in the contract, not in a marketing post.

Engine overhaul

A top-end overhaul is expected around year three, about 1.0–1.5 million RUB. It is a scheduled operation, and who pays for it is agreed in the contract before signing. A major overhaul comes at 60,000 operating hours, that is 7+ years.

See where the station would run

Both sites are in operation. Visit by appointment or ask for a live video tour.

Larger projects: 10–50 MW

For investors with access to gas or a site we design and build mining infrastructure in phases (for example 12.5 + 12.5 + 25 MW) on Bitmain Antspace hydro containers and Weichai gas generation. As a guide, container and ASIC kits with VAT and delivery to Moscow come to roughly 34–56 million RUB per MW depending on the miner model; design, installation and commissioning are quoted separately. An estimate, not a guarantee of income and not a public offer.

Turnkey mining data center construction →

Hydro containers: hosting and supply →

How gas-powered Bitcoin mining works on our sites →

Is Bitcoin mining legal in Russia? →

Questions

Is there a guarantee of income?

No. The lease is paid on actual kWh generated. The figures on this page are an estimate at 8,000 operating hours a year and a 300 kW load; downtime that is not our fault and a lower load reduce generation. A minimum payment, if any, is set in the contract. This is not a public offer.

Who pays for gas and maintenance?

We do. 1 RUB per kWh is a net lease of your station; gas, maintenance, oil, repairs and staff are our costs, covered by the hosting rate our clients pay.

Is this an investment in mining or in energy?

Formally in energy: you own a gas power station and receive a lease for the kWh it generates. Those kWh are consumed by miners on our hosting, so it is also a way into mining without buying ASICs: income is tied to generation, not directly to the Bitcoin price or network difficulty. The lease is paid on actual generation, not on a schedule.

How is this different from buying ASICs?

An ASIC becomes outdated in two to three years and loses value as network difficulty grows. A gas genset runs 60,000 operating hours, about seven years of continuous operation, and keeps its liquidity: there is steady demand for 400 kW units. You are paid for kWh, and kWh are consumed at any Bitcoin price.

Does the income depend on the Bitcoin price?

Not directly: you are paid per kWh, and our hosting clients consume those kWh at any Bitcoin price. Indirectly, demand for hosting depends on mining economics.

Can I see the site and the station?

Yes. The sites are in operation: Rybushanskoe (15 MW) and Surovskoe (8 MW) in the Saratov region. Visit by appointment or ask for a video tour. Case studies with photos and figures are open on this site.

What happens at the end of the contract?

Three options: extend the lease, sell the station to us or on the market, or take it to your own site with 90 days' notice.

Can I buy more than one station?

Yes. Three stations make 1.2 MW, the same as at our clients' sites in Vyksa and Samara. Larger volumes are calculated separately and are better added in phases.

Can foreign investors take part?

Contracts are signed with TDM LLC in RUB. Clients outside Russia: case by case. Please check the rules of your jurisdiction, including sanctions, with your counsel first.

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.