Natural gas generators for industrial power

Own gas generation for plants and factories: a lower and stable cost per kWh, heat for buildings and processes, parallel operation with the grid. Weichai, Yuchai and Jichai gensets.

Gas genset in a sound-attenuated canopy on a concrete base next to a production building
3.75 RUB/kWh
own generation on our sites, incl. VAT
5.7 RUB/kWh
typical grid tariff
250–1,375 kW
Weichai units for plants
80–90%
total efficiency with CHP

For a plant, own gas generation solves two problems at once: it lowers the cost of a kilowatt-hour and removes the dependence on grid tariffs and connection limits. The heat from the gensets goes to space heating and process needs.

For reference: on our own sites a kilowatt-hour from own gas gensets costs 3.75 RUB/kWh incl. VAT, while a typical grid tariff is 5.7 RUB/kWh. For your plant we calculate it from your gas price and load profile.

Typical gensets for plants

ModelPowerEngineGas at full loadOpen-frame price, incl. VAT
Weichai WPG312250 kW (200 continuous)WP13D317E300NG · 1,500 rpm54 m³/h4,150,000 RUB≈ $50,500
Weichai WPG500In stock: 3400 kW (320 continuous)Weichai (Baudouin) 6M33D450E310NG · 1,500 rpm85 m³/h7,990,000 RUB≈ $97,300
Weichai WPG625625 kW (500 continuous)Baudouin 12M26G2N0/5 · 1,500 rpm130 m³/hPrice on request
Weichai WPG1000800 kW (670 continuous)Baudouin 12M33G10N0/5 · 1,500 rpmto be confirmed28,452,000 RUB≈ $346,300
Weichai WPG13751,375 kW (1,100 continuous)Baudouin 16M33G6N0/5 · 1,500 rpmto be confirmed35,000,000 RUB≈ $426,000

Prices are for the genset on an open frame, incl. VAT, excluding canopy, delivery and commissioning. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.

Yuchai and Jichai for plants

ModelPowerEngineGas at full loadOpen-frame price, incl. VAT
Yuchai YC6KG-200N5LC200 kWYC6K350N-D30 · 1,500 rpm63.3 m³/h3,890,000 RUB≈ $47,400
Yuchai YC6KG-250N5LC250 kWYC6K420N-D30 · 1,500 rpm78.2 m³/h4,690,000 RUB≈ $57,100
Yuchai YC6CG-400N5LC400 kWYC6C750N-D30 · 1,500 rpm153 m³/h7,990,000 RUB≈ $97,300
Jichai 400GF-TK1400 kW12V190DT-2 · 1,000 rpm≈ 136 m³/h7,990,000 RUB≈ $97,300
Yuchai YC6CG-500N5LC500 kWYC6C935N-D30 · 1,500 rpm190.1 m³/h12,900,000 RUB≈ $157,000
Jichai 500GF-T500 kW12V190ZDT-2 · 1,000 rpm≈ 170 m³/h12,900,000 RUB≈ $157,000
Yuchai YC6CG-600N5LC600 kWYC6C1020N-D30 · 1,500 rpm203.5 m³/h15,490,000 RUB≈ $188,600
Yuchai YC12VTDG-700N5LC700 kWYC12VTD1150N-D30 · 1,500 rpm216.3 m³/h18,900,000 RUB≈ $230,100
Jichai 750GF-T750 kWC12V190ZLT-2 · 1,000 rpm≈ 213 m³/h22,900,000 RUB≈ $278,800
Yuchai YC12VTDG-800N5LC800 kWYC12VTD1350N-D30 · 1,500 rpm211 m³/h22,900,000 RUB≈ $278,800
Yuchai YC12VCG-1000N5LC1,000 kWYC12VC1680N-D31 · 1,500 rpm288.2 m³/h29,900,000 RUB≈ $364,000
Yuchai YC16VTDG-1100N5LC1,100 kWYC16VTD1830N-D30 · 1,500 rpm270.9 m³/h33,900,000 RUB≈ $412,700
Jichai 1100GF-T1,100 kWH16V190ZLT-2 · 1,000 rpm≈ 302 m³/h31,900,000 RUB≈ $388,300
Jichai 1200GF-T1,200 kWL12V200ZLT-2 · 1,000 rpm≈ 322 m³/h34,900,000 RUB≈ $424,800

What to look at

Load profile

Count the daily profile, not the peak: a one-shift plant and a continuous process need different solutions.

Cogeneration

Recovering heat from the exhaust and the engine jacket raises total efficiency to 80–90%. For plants with a heat load it changes the economics.

Redundancy

If stopping a workshop costs more than the equipment, install two units in parallel instead of one.

Fuel

The gensets run on natural gas; treated associated petroleum gas and, for some models, LPG are also possible. Start with a gas analysis.

Related pages

Case studies and articles

Questions

Do I have to disconnect from the grid?

No. The gensets support parallel operation with the grid: own generation covers the base load and the grid stays as a backup.

How much can a plant save on electricity?

On our own sites own generation costs 3.75 RUB/kWh per kWh incl. VAT against a typical grid tariff of 5.7 RUB/kWh. Your saving depends on your gas price, your tariff and how much of the heat you use; we calculate it for your plant. This is an estimate, not a guarantee.

Can the gensets also heat the plant?

Yes. An exhaust heat recovery boiler gives about 1 kW of heat per kW of power; with jacket water recovery up to about 1.45 kW. It is planned before the genset is ordered.

What do you need from us to make a proposal?

The load profile (or monthly consumption and peak), the gas supply parameters and the site address. If heat is needed, the area and type of buildings and whether hot water is required.

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.