Weichai WPG625NG natural gas generator, 625 kW
Natural gas generator set: 625 kW prime power, 500 kW continuous, Baudouin 12M26G2N0/5 engine. Supply, installation, commissioning and service in Russia.

The WPG625 gives a true 500 kW around the clock: 625 kW prime power and 500 kW continuous. It runs on a Baudouin 12M26 V12 gas engine with a Leroy Somer alternator. It is the right choice when a plant needs 400–500 kW continuously and the WPG500 would run at its limit.
At full load it uses 130 m³ of gas per hour, about 0.26 m³ per kWh. Hours to major overhaul: 60,000 operating hours if the maintenance schedule is followed.
Price and configurations
For a machine hall or an existing building. The site price: genset only, excluding canopy and commissioning.
Galvanized steel canopy with acoustic lining and service hatches, for an outdoor site.
Built to the project: insulated container with ventilation, fire protection, gas train, exhaust and switchboard.
Prices are for the genset on an open frame, incl. VAT, excluding canopy, delivery and commissioning. Send us the site address, the load and the gas parameters, and we will quote the unit with delivery and commissioning. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.
Specifications
Specifications are the manufacturer's data. 50 Hz units: the output is 0.4 kV. We send a full English specification on request.
Photos


For Bitcoin mining
Continuous power (COP) is the figure for round-the-clock operation; prime power allows overload only for a limited number of hours a year.
Air-cooled machines drawing about 3.5 kW each, with headroom for container ventilation and auxiliary load.
Example at a gas price of 8 RUB/m³: 0.26 m³ per kWh, without oil and service. Your figure depends on your gas price.
Estimates for planning, not a guarantee. More on sizing: gas generators for Bitcoin mining. Prefer not to run a genset yourself? Host your ASICs on our own gas power: gas-powered Bitcoin mining hosting.
Warranty, lead time and service
24 months or 8,000 operating hours, whichever comes first.
About 50 days from order.
Scheduled maintenance every 1,000 operating hours, 60,000 operating hours to major overhaul. Service under contract by our team in Russia.
An exhaust heat recovery boiler for this unit costs 1,500,000 RUB incl. VAT≈ $18,300 and gives about as much heat as the genset gives electricity, about 625 kW. See cogeneration (CHP) and heat recovery systems.
Compare and choose
Case studies and articles
Questions
How much does the Weichai WPG625 cost?
The price is on request: the unit is built to order, and we quote it with the configuration, delivery and commissioning for your site.
How much gas does the WPG625 use?
130 m³ per hour at full load. Size the gas supply on full-load consumption, not on the average: a lack of volume or pressure shows up under load.
How many ASIC miners can the WPG625 power?
About 134 air-cooled ASICs drawing about 3.5 kW each. We count on 500 kW of continuous power and keep about 6% for container ventilation and auxiliary load; prime power is not a 24/7 figure.
What is the warranty and lead time for the WPG625?
Warranty: 24 months or 8,000 operating hours, whichever comes first. Lead time: about 50 days. Service under contract is done by our team in Russia.
Is the WPG625 available in a canopy or a container?
Yes. The unit is supplied on an open frame, in a sound-attenuated canopy or in a container. A canopy suits an outdoor site; a container is a room with ventilation, lighting and space for service work.
Talk to the team