Jichai 750GF-T natural gas generator, 750 kW

Natural gas generator set: 750 kW / 938 kVA, Jichai C12V190ZLT-2 gas engine at 1,000 rpm. Supply, installation, commissioning and service in Russia.

Jichai 750GF-T gas genset, general view
750 kW
rated power, 938 kVA
22,900,000 RUB
open frame, incl. VAT
≈ 213 m³/h
gas at full load
12 mo
warranty from commissioning

The 750GF-T runs on the Jichai C12V190ZLT-2 gas engine, a V12 unit at 1,000 rpm, and gives 750 kW / 938 kVA at 0.4 kV, 50 Hz. This size suits a plant, a large boiler house or a mining site of one or two containers.

At full load it uses about 213 m³ of gas per hour, about 0.28 m³ per kWh (calculated from the factory's specific heat rate). The factory does not publish hours to major overhaul for this model; we fix them in the quote.

Price and configurations

Open frame
22,900,000 RUB incl. VAT≈ $278,800

For a machine hall or an existing building. The site price: genset only, excluding canopy and commissioning.

Container
Quoted for your project

Quoted for your project together with delivery and commissioning.

Prices are for the genset on an open frame, incl. VAT, excluding canopy, delivery and commissioning. That is about 30,500 RUB per kW of rated power for the open frame. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.

Specifications

Generator set
Model750GF-T
Rated power750 kW / 938 kVA
Voltage, frequency0.4 kV (on request 6.3 or 10.5 kV), 50 Hz, cos φ 0.8
Speed1,000 rpm
Specific heat ratemax. 9,500 kJ/kWh
Electrical efficiencyapprox. 37.9% (calculated from the specific heat rate)
Gas consumption at 100% loadapprox. 213 m³/h (calculated for gas with 33.5 MJ/m³)
Engine
ModelC12V190ZLT-2
Engine power830 kW
Cylinders12, V-type
Bore × stroke190 × 230 mm
Displacement78.3 L
Type4-stroke, turbocharged with charge air cooling, spark ignition
Lube oil consumption≤0.6 g/kWh
Alternator
Typebrushless synchronous, AVR
Protection ratingIP23
Insulation classH
Gas and cooling
Fuelnatural gas
Coolingopen (cooling tower) or closed (radiator)

Specifications are the manufacturer's data. 50 Hz units: the output is 0.4 kV (medium voltage on request). We send a full English specification on request.

Photos

Jichai 750GF-T gas genset, general view
Jichai 750GF-T gas genset, general view
Jichai 750GF-T gas genset, general view
Jichai 750GF-T gas genset, general view
Jichai gas genset, general view (example from the same series)
Jichai gas genset, general view (example from the same series)

For Bitcoin mining

638 kW for a 24/7 load

For round-the-clock operation plan on about 85% of rated power: this is how hours to overhaul are counted.

About 182 ASICs

Air-cooled machines drawing about 3.5 kW each, with headroom for container ventilation and auxiliary load.

≈ 2.27 RUB/kWh for fuel

Example at a gas price of 8 RUB/m³: 0.28 m³ per kWh, without oil and service. Your figure depends on your gas price.

Estimates for planning, not a guarantee. More on sizing: gas generators for Bitcoin mining. Prefer not to run a genset yourself? Host your ASICs on our own gas power: gas-powered Bitcoin mining hosting.

Warranty, lead time and service

Warranty

12 months from commissioning.

Lead time

45–100 days from order.

Service

Scheduled maintenance by the factory schedule, Service under contract by our team in Russia.

Compare and choose

Case studies and articles

Questions

How much does the Jichai 750GF-T cost?

22,900,000 RUB incl. VAT for the genset on an open frame, excluding canopy and commissioning. Delivery is quoted from the site address.

How much gas does the 750GF-T use?

About 213 m³ per hour at full load, calculated from the factory's maximum specific heat rate for gas with 33.5 MJ/m³. Size the gas supply on full-load consumption, not on the average: a lack of volume or pressure shows up under load.

How many ASIC miners can the 750GF-T power?

About 182 air-cooled ASICs drawing about 3.5 kW each, counting on about 638 kW of 24/7 load (85% of rated power).

What is the warranty and lead time for the 750GF-T?

Warranty: 12 months from commissioning. Lead time: 45–100 days. Service under contract is done by our team in Russia.

Is the 750GF-T available in a container?

The price is for the open frame. A container is quoted for your project together with delivery and commissioning.

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.