Gas engine CHP and cogeneration units

Gas engine CHP: electricity and heat from one genset. About 1 kW of heat per kW from the exhaust, up to 1.45 kW with jacket water. Heat recovery boilers, design and installation.

250 kW gas genset in a winterized container with an exhaust heat recovery unit on the roof
≈ 1 kW
heat per kW from the exhaust
≈ 1.45 kW
with jacket water recovery
from 5,206,000 RUB
250 kW CHP plant, incl. VAT
≈ 80%
total efficiency

About 40% of the energy in natural gas becomes electricity. The rest is heat: in the exhaust, in the engine jacket, in the oil. Cogeneration (CHP) recovers this heat with heat exchangers and puts it to work instead of releasing it into the air, and total efficiency reaches about 80%.

A small CHP plant (combined heat and power) is the same gas genset with a heat recovery system. When several units cover a whole site with electricity and heat, with redundancy and a common switchboard, the project is usually called an energy center.

Weichai gensets with a CHP version

Seven of the eight Weichai models are available in a cogeneration version; the WPG1375 is supplied with a heat recovery system.

ModelPowerEngineGas at full loadOpen-frame price, incl. VAT
Weichai WPG312250 kW (200 continuous)WP13D317E300NG · 1,500 rpm54 m³/h4,150,000 RUB≈ $50,500
Weichai WPG500In stock: 3400 kW (320 continuous)Weichai (Baudouin) 6M33D450E310NG · 1,500 rpm85 m³/h7,990,000 RUB≈ $97,300
Weichai WPG625625 kW (500 continuous)Baudouin 12M26G2N0/5 · 1,500 rpm130 m³/hPrice on request
Weichai WPG1000800 kW (670 continuous)Baudouin 12M33G10N0/5 · 1,500 rpmto be confirmed28,452,000 RUB≈ $346,300
Weichai WPG13751,375 kW (1,100 continuous)Baudouin 16M33G6N0/5 · 1,500 rpmto be confirmed35,000,000 RUB≈ $426,000
Weichai WPG15001,500 kW (1,200 continuous)Baudouin 16M33G6N0/5 · 1,500 rpm310 m³/hPrice on request
Weichai WPG35003,500 kW (2,800 continuous)Baudouin 20M55G6N1/5 · 1,500 rpm649 m³/hPrice on request

Prices are for the genset on an open frame, incl. VAT, excluding canopy, delivery and commissioning. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.

Where the heat comes from

Exhaust: ≈ 1 kW per kW

450–550 °C cooled to 120 °C in a heat recovery boiler on the exhaust line. Water at 95 °C and above, steam if needed. The engine cooling system is not touched.

Jacket water: ≈ 0.4–0.5 kW per kW

80–95 °C from a plate heat exchanger in the engine cooling circuit. Less heat and more work: it pays off from about 800 kW.

Full recovery: ≈ 1.4–1.5 kW per kW

Exhaust and jacket water with common controls. An emergency radiator cools the engine when the heat consumer is off.

CHP plant turnkey: what it costs

PowerGenset, open frameExhaust heat recovery boilerTotal, incl. VAT
250 kW (WPG312)≈ 250 kW of heat4,150,000 RUB≈ $50,5001,056,000 RUB≈ $12,900from 5,206,000 RUB≈ $63,400
400 kW (WPG500)≈ 400 kW of heat7,990,000 RUB≈ $97,300900,000 RUB≈ $10,960from 8,890,000 RUB≈ $108,200
625 kW (WPG625)≈ 625 kW of heatPrice on request1,500,000 RUB≈ $18,300Genset on request + boiler

The heat circuit of the building (pumps, piping, controls) is quoted separately: it depends on where the heat goes. Boiler types, design rules and the full price list: heat recovery systems. ≈ $ at the Central Bank of Russia rate of 82.15 RUB/USD as of Nov 14, 2026. Contracts and payments in RUB.

Where a CHP plant pays off

Greenhouses

Heat is needed all year, and CO₂ from cleaned exhaust can feed the plants. Almost everything the gas gives is used.

Plants with year-round heat

Process steam and hot water are needed not only in winter, so the heat is not idle in summer.

Dairy and food production

Pasteurization, washing, hot water: an even heat demand all year.

Drying grain and timber

Drying chambers take heat from the exhaust without a separate gas boiler.

Settlements and boiler houses

Space heating and hot water: all of the heat in winter, hot water in summer.

Oilfields

Heating oil and buildings, power for pumps and a camp, on treated associated gas.

250 kW gas genset in a winterized container with an exhaust heat recovery unit on the roof, Moscow region
Heat recovery on a 250 kW genset in a winterized container, Moscow region: the heat exchanger on the roof takes heat from the exhaust for space heating. Photo report (in Russian)

What to look at

Is there a use for the heat?

The main question, and it is not technical. CHP pays off where heat is needed all year: production, greenhouses, drying, district heating. If the circuit is idle in summer, the economics count only the winter.

How much heat you get

Roughly as much heat as electricity, sometimes more: about 1 kW from the exhaust and 0.45 kW from the jacket water per kW of prime power. Jacket water recovery pays off from about 800 kW.

What is added to the genset

Heat exchangers, a pump group, piping and controls of the heat circuit. This is a separate part of the project with its own cost, quoted for the site.

Electrical power does not grow

A 500 kW unit stays a 500 kW unit. Cogeneration adds heat, not kilowatts, and does not change the sizing of a mining load.

A site in the Moscow region: a 250 kW genset in a winterized container with an exhaust heat recovery unit on the roof; hot water goes to space heating.

Related pages

Case studies and articles

Questions

How much does a gas CHP plant cost?

A 250 kW CHP plant on the Weichai WPG312 with an exhaust heat recovery boiler starts at 5,206,000 RUB incl. VAT: genset 4,150,000 RUB and boiler 1,056,000 RUB. At 400 kW (WPG500) it starts at 8,890,000 RUB. The heat circuit of the building (pumps, piping, controls) is quoted separately.

What do I do with the heat in summer?

Use it for hot water and processes: washing, pasteurization, drying, heating water in greenhouses. Or add an absorption chiller to turn heat into cooling for warehouses and food production (trigeneration). If there is no use for the heat, it is dumped through a radiator and the genset keeps producing electricity.

Is a mini CHP plant the same as a cogeneration genset?

In practice, yes. A mini CHP plant is the same equipment named by its result: a station that gives a site both electricity and heat. Specifications often say CHP plant, manufacturers' price lists say cogeneration unit.

Is cogeneration worth it for mining?

Usually not. There is no use for heat on a mining site: in winter the machines already give plenty, in summer the circuit is idle. Money put into heat exchangers there pays back worse than the same money put into a second genset.

Which models have a CHP version?

Seven of the eight Weichai models: WPG312, WPG500, WPG625, WPG1000, WPG1375, WPG1500 and WPG3500. For Yuchai and Jichai units, heat recovery is quoted for the project.

Talk to the team

We answer in English. Tell us what you are looking for (hosting, equipment or an investment) and we will come back with numbers, documents and, if you wish, a video tour or a site visit.

What do you need?
Prefer email? Write to fastminesales@gmail.com.